Call to chat to our team Find your
nearest location

Product available in: Vic, Sa, Qld

A full range of insulation is available to help keep the cold out and the heat in. Insulation under all roofs is recommended to reduce your buildings heating & cooling costs. It also provides control of condensation and reduces outside noise.

Our comprehensive warehouse holds stock of the following products for immediate delivery –

  • Reflective Foil Insulation
  • Glasswool Blanket
  • Foil Faced Glasswool Blanket
  • Roof Safety Mesh

We are also able to supply on short lead time other insulation products such as Glasswool Batts, Rockwool & Polyester products

Enquire about Product

ADVERSE CONDITIONS
If material is to be used within 1km of salt marine, industrial or corrosive environments please contact our Apex sales staff.

WARRANTIES
Our products are supported by Bluescope Steel Limited and a full warranty is available.

LENGTHS / TRANSPORT
Apex Building Products can custom cut lengths to your requirements. Due to transport restrictions it is advisable to check with our office the maximum length.

HANDLING
Care should be taken at all times when handling Corrugated. Packs must be kept dry and stored above ground level, should the sheets become wet separate immediately and individually wipe and place in an area to dry.

COMPATIBILITY
ZINCALUME® steel sheeting is compatible with most roofing products. It is NOT recommended to use lead flashing/nails, copper or copper alloy materials with or in run-off situations.

CUTTING
Apex Building Products provides this service, however sheets may be cut using a power saw with a metal cutting blade. COLORBOND® steel sheeting must be cut with the coloured surface facing the ground. Ensure that no hot particles or debris come into contact with the COLORBOND® .

CLEAN UP
To prevent premature corrosion at the completion of each day ensure the sheeting area is cleared of all debris, including nails, rivets, rags and all cutting or drilling filings.

DELIVERY
Apex Building Products delivers to site within 1 to 2 days. To prevent any damage we require suitable arrangements to be made for unloading. Unloading by crane, ensure the load is evenly spread, if crane unavailable adequate manpower is required.